The Ministry of Finance's Mandatory Fields specification, now at version 1.1 dated 28 October 2026, lists the data elements every UAE electronic invoice must carry. They fall into five groups: document header, seller and buyer identification, line items, VAT breakdown, and document totals. Most are already present in a well-kept ERP; the gaps are usually identifiers, codes and structured addresses rather than amounts.
Key facts at a glance
- Specification version 1.1, published 28 October 2026, accompanying Guidelines v2.0.
- Commonly described as 51 mandatory fields; conditional fields apply in specific scenarios.
- Implemented technically through the PINT AE Peppol specification and its validation rules.
- Identifiers use the TIN with Peppol scheme 0235.
- Amounts are expressed in AED for VAT purposes, even on foreign-currency invoices.
Group 1: Document header
Invoice number, issue date, document type (invoice or credit note), currency, and for credit notes a reference to the invoice being corrected. Also the invoice period where the supply is continuous, and the buyer reference or purchase order number where the buyer requires it. The most common header error in practice is a non-unique invoice number across branches that share a TIN.
Group 2: Seller and buyer
Each party needs a legal name, a structured address with country code, and identifiers: the Peppol participant identifier built from the TIN, and the TRN where the party is VAT-registered. A free-text address block copied from a letterhead does not satisfy the structured requirement. For buyers that are not VAT-registered, the TIN still identifies them; for individuals in the rare in-scope B2C-like cases, the specification sets out what to provide.
Group 3: Line items
Per line: a description, quantity with a unit code, unit price, line net amount, VAT category code and rate, and where relevant item classification data such as the reverse-charge goods code. Discounts and charges are expressed as allowances and charges with their own VAT treatment rather than netted invisibly into the price.
Group 4: VAT breakdown
One breakdown entry for every VAT category and rate used on the document, each with its taxable amount and VAT amount. Zero-rated, exempt, out-of-scope and reverse-charge categories each need a reason code. Arithmetic across lines and breakdowns must agree to the cent after rounding; this is where legacy systems that round per line in one place and per invoice in another get caught.
Group 5: Totals and payment
Sum of line net amounts, total allowances and charges, taxable total, total VAT, total with VAT, amount prepaid and amount due. Payment means and terms are included where applicable. Where the invoice currency is not AED, the VAT amount in AED and the exchange rate used are mandatory.
| Group | Typical ERP source | Typical gap |
|---|---|---|
| Header | Sales invoice table | Non-unique numbers; missing credit-note reference |
| Parties | Customer master | Unstructured addresses; no TIN/TRN captured |
| Lines | Invoice lines + item master | Missing unit codes; hidden discounts |
| VAT breakdown | Calculated at posting | Missing exemption reason codes; rounding drift |
| Totals | Invoice header totals | Prepaid amounts not tracked; FX rate not stored |
Where Zaini Developers fits in
A mandatory-fields audit is the first thing we run on any system. It produces a gap list per group, and most gaps close with master-data fixes rather than code changes.
Book a free consultation →Frequently asked questions
Is it exactly 51 fields for every invoice?
The specification lists the mandatory set and a number of conditional fields that become mandatory in particular scenarios, such as foreign currency or reverse charge. Treat 51 as the core.
Do I need the buyer's TRN if they are not VAT registered?
You need the buyer's identifier; for unregistered buyers that is the TIN they obtain from the FTA. The TRN is required where the buyer is registered.
Where is the field list published?
In the MoF's 'UAE Electronic Invoice Mandatory Fields' document, with technical implementation in the PINT AE specification on docs.peppol.eu.
What happens if a mandatory field is empty?
The ASP's validation rejects the document and it is not transmitted or reported. It must be corrected and resubmitted within the issuance window.
