1. Home
  2. All UAE e-invoicing guides
  3. GCC E-Invoicing

GCC E-Invoicing

Saudi E-Invoicing Wave 25: What Businesses Above SAR 187,500 Must Do by 1 February 2027

ZATCA has halved the threshold again. Wave 25 pulls thousands of smaller Saudi businesses into the Fatoora integration phase, and the deadline is 1 February 2027.

SZ
Sahil ZainiCRM & ERP Development
·17 Nov 2026·4 min read

If your VAT-subject revenue exceeded SAR 187,500 in any of 2022, 2023, 2024 or 2025, ZATCA's Wave 25 requires your e-invoicing solution to be integrated with the Fatoora platform by 1 February 2027. Phase 2 means your system must connect to Fatoora, issue invoices in the prescribed XML format and meet the extra technical requirements.

Key facts at a glance

  • Wave 25 threshold: VAT-subject revenue above SAR 187,500 in any of 2022, 2023, 2024 or 2025.
  • Integration deadline: 1 February 2027.
  • Wave 24 (above SAR 375,000) had a deadline of 30 June 2026, so Wave 25 halves the threshold.
  • ZATCA notifies each wave at least six months before its deadline.
  • Phase 2 means integrating with Fatoora, not just printing a QR code.

What changed with Wave 25

On 24 July 2026 the Zakat, Tax and Customs Authority (ZATCA) published the criteria for Wave 25 of the Integration Phase. Taxpayers whose VAT-subject revenues exceeded SAR 187,500 in any of 2022, 2023, 2024 or 2025 must integrate their e-invoicing solutions with the Fatoora platform by 1 February 2027. It is the first wave to count 2025 revenue, and the threshold is half the SAR 375,000 used for Wave 24.

Phase 1 vs Phase 2 in plain words

Phase 1 (Generation)Phase 2 (Integration)
Since4 December 2021In waves since January 2023
What it needsElectronic invoices from a compliant system, QR code on simplified invoicesYour system connected to Fatoora, invoices in the prescribed XML format, extra fields and cryptographic stamping
B2B (standard) invoicesGenerated electronicallyCleared by Fatoora before you share them
B2C (simplified) invoicesGenerated electronicallyReported to Fatoora after issue

What you need to do before 1 February 2027

1. Confirm you are in Wave 25Check your VAT-subject revenue for 2022 to 2025 and watch for ZATCA's notification.
2. Check your softwareAsk your vendor in writing whether your current system is integrated with Fatoora for Phase 2, including onboarding and stamping.
3. Clean your dataBuyer VAT numbers, addresses and item tax categories must be complete, just like in the UAE.
4. Onboard and testRegister your solution units with ZATCA, test clearance and reporting, then switch over.
5. Train your teamAccepted invoices are corrected with credit or debit notes, not edits.

If you sell in both the UAE and Saudi Arabia

The UAE uses a Peppol-based five-corner model with PINT AE through an Accredited Service Provider. Saudi Arabia uses a central clearance model through Fatoora. The same invoice data, two different routes. A well-built system keeps one clean customer and item master and produces both formats. See our GCC comparison and UAE guide.

How we help

Zaini Developers builds ERP, CRM and POS systems and connects existing software to e-invoicing platforms. We are not ZATCA or a ZATCA-approved provider; we do the engineering so your system meets the requirements. Read moving from Zoho, Tally or QuickBooks to a custom ERP if your current tool is holding you back.

Frequently asked questions

Who is in ZATCA Wave 25?

Resident taxpayers whose revenue subject to VAT exceeded SAR 187,500 in any of 2022, 2023, 2024 or 2025, according to ZATCA's announcement of 24 July 2026.

What is the Wave 25 deadline?

Integration with the Fatoora platform must be completed by 1 February 2027.

Is a QR code on my invoice enough?

No. That was Phase 1. Phase 2 requires your e-invoicing solution to be integrated with Fatoora and to issue invoices in the prescribed format.

Can one system handle UAE and Saudi e-invoicing?

Yes, if it keeps one clean data model and produces both the UAE PINT AE format through an ASP and the Saudi format through Fatoora.

Does ZATCA notify businesses in each wave?

Yes. ZATCA states it notifies targeted taxpayers at least six months before the integration deadline.

This guide explains published UAE rules in plain language. It is not tax or legal advice; confirm your own position with a registered tax adviser. Product names belong to their owners; Zaini Developers is not affiliated with them.
Free E-Invoicing Readiness CheckAnswer 8 quick questions and get your score and action plan.
Check my readiness

Let's build together

Selling across the GCC? One system, every e-invoicing format.

We build ERP, CRM and POS systems that produce UAE, Saudi and Omani e-invoices, and connect your existing software to each country's providers.

Chat on WhatsApp